This section describes how to upgrade from Abiquo 4.7.0 or above to the current Abiquo version. Please contact Abiquo Support for further information.

 

Major upgrade

The upgrade to Abiquo 5.2.0 is a major upgrade with upgrades of third-party software packages that are critical platform dependencies

You must make snapshots of ALL servers before you start the upgrade

  • Abiquo YUM repositories are no longer open, please contact Abiquo Support to obtain your credentials
  • This upgrade process starts from Abiquo 4.7 or above. To upgrade from earlier versions, please contact Abiquo Support


1. Prepare branding

  • If you are upgrading from Abiquo 4.7.x, the new UI in Abiquo 5.0 requires new branding. See Abiquo Branding Guide




2. Prevent cloud users from performing VM operations

  1. In the UI in the Infrastructure view, select each physical machine and click Disable
  2. Using the API, set the state of each physical machine to DISABLED




3. Check for operations in progress on the platform

Before you shut down the platform servers you should check that no operations are in progress.




4. Stop platform services




5. Make snapshots and backups of all platform servers

The upgrade to Abiquo 5.2.x is a major upgrade with upgrades of third-party software packages that are critical platform dependencies

You MUST make snapshots of all servers in your platform before you upgrade to Abiquo 5.2.x.

It may also be convenient to make a quick backup of all important system data. For more details, see Prepare to Upgrade Abiquo.


If you are using HTTPS-SSL between your Tomcat servers, for each Tomcat server:

From the /opt/abiquo/tomcat/conf folder, back up the server.xml files. You will need to restore and modify them after the yum upgrade.

See Upgrade Tomcat 8 to Tomcat 9 with HTTPS-SSL.




6. Disable old billing dashboard scripts

In Abiquo 5.2, the billing dashboard feature is now in the core Abiquo platform.

If you are using the billing dashboard scripts from previous versions, disable them before you continue with the upgrade.

  1. On the server where you were running the billing packages, remove the Cron jobs to run the billing scripts.

    # rm /etc/cron.d/abiquo-billing-ec2
    # rm /etc/cron.d/abiquo-billing-arm


7. Prepare yum repositories on all servers

Unable to render {include} The included page could not be found.



8. Upgrade Datanode servers in HA

Unable to render {include} The included page could not be found.




9. Upgrade UI servers in HA

Unable to render {include} The included page could not be found.




10. Upgrade load balanced API servers in HA

Unable to render {include} The included page could not be found.




11. Upgrade Remote Services servers

Unable to render {include} The included page could not be found.




12. Upgrade Monitoring server

Unable to render {include} The included page could not be found.



13. Upgrade steps from 4.7.x to 5.0.x

Start with your original version and perform the steps to the final version.

 Click for Upgrade steps from 4.7.x to 5.0.x

Unable to render {include} The included page could not be found.




14. Upgrade steps from 5.0.x to 5.1.x

Start with your original version and perform the steps to the final version.

 Click for Upgrade steps from 5.0.x to 5.1.x for Veeam

Unable to render {include} The included page could not be found.


 Click for Upgrade steps from 5.0.x to 5.1.2 or 5.2.x for VM names

Unable to render {include} The included page could not be found.





15. Upgrade steps from 5.1.x to 5.2.x

Start with your original version and perform the steps to the final version.

When upgrading from 5.1.0 or 5.1.1 to 5.1.2 or above, follow the steps from the Upgrade steps from 5.0.x to 5.1.x block.


 Click for Upgrade steps from 5.1.x to 5.2.x for Azure


Unable to render {include} The included page could not be found.


 Click for Upgrade steps from 5.1.x to 5.2.x for Tomcat with SSL

Unable to render {include} The included page could not be found.

 Click for Upgrade steps from 5.1.x to 5.2.x for Redis


Unable to render {include} The included page could not be found.

 Click for Upgrade steps from 5.1.x to 5.2.x for billing dashboards


Unable to render {include} The included page could not be found.




16. Configure Abiquo after the upgrade

  1. Before you start the Abiquo tomcat server, add Abiquo Configuration Properties to the abiquo.properties file.
    By default the abiquo.properties file is found in the /opt/abiquo/config/ folder.
    See Changes to Abiquo Configuration Properties

  2. Configure the user interface. The default UI location is /var/www/html/ui.
    Optional: Add custom labels and translations in the lang_xx_XX_custom.json files in the lang folder
    Add custom configuration to client-config-custom.json. See Configure Abiquo UI
    If your API is not in the same domain as the UI, set the API endpoint pointing to your Abiquo API server:

    {
        "config.endpoint": "http://myAPIserver/api"
    }
  3. Reporting changes: To upgrade the Abiquo Reports database for the upgrade to Abiquo 4.7.x+, contact Abiquo Support for the file and procedure.




17. Start Abiquo servers and services

To start the Abiquo platform servers and services, do these steps:

  1. On the Abiquo server, restart the HTTP daemon to refresh the user interface files, and bring up the Tomcat server.

    service httpd start
    service abiquo-tomcat start
  2. On the Remote services server, start the Tomcat server

    service abiquo-tomcat start
  3. On the Monitoring server do these steps.

    1. Edit the file /opt/kairosdb/conf/kairosdb.properties to update the name of the following variable and to remove the port from it:

      1. Replace the line kairosdb.datastore.cassandra.host_list=192.168.888.999:9160.

      2. With this line kairosdb.datastore.cassandra.cql_host_list=192.168.888.999. Please note the new cql_ prefix for host_list.

    2. Edit the file /etc/cassandra/conf/cassandra.yml OR /etc/cassandra/default.conf/cassandra.yaml (whichever exists) to remove a variable:

      1. Remove the line starting with kairosdb.datastore.cassandra.datapoint_ttl and save and close the file.

    3. Edit the file /opt/kairosdb/conf/kairosdb.properties to add a new variable (ref: Internal JIRA SUP-333):

      1. Add kairosdb.datastore.cassandra.datapoint_ttl = 15768000

  4. On the Monitoring server, start the Cassandra service

    sudo service cassandra start
  5. WAIT about 5 minutes until the service is up and running

  6. Start the KairosDB service

    sudo service kairosdb start
  7. Start the other services in this order

    sudo service abiquo-emmett start
    sudo service abiquo-delorean start
  8. On the V2V server: restart the Tomcat server:

    service abiquo-tomcat restart

  9. In Abiquo, re-enable the physical machines! (smile)

  10. Clear your browser cache to prevent glitches in the UI