Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The PIM migrator performs the provider ID migration in the compute, backup, and networking providers via the Remote Services servers.

  • It updates the VMs, backups, firewalls, and load balancers in the providers and in Redis

  • It also tests the migration in dry run mode

What does it output?

  • An SQL file to run on the kinton database

  • A log in standard output (you should redirect it to a file)

PIM migrator requirements

The PIM migrator requires the following.

  • The migration plan from the PIM planner

  • Access to:

    • the Redis instance of the Remote Service server.

    • the hypervisors in the datacenter


Before you run the PIM migrator

Do these steps.

  1. Start the Abiquo upgrade to 5.3 as usual including

    1. Stop the Abiquo platform

    2. Create backups including snapshots, Database dump, and Redis dump

  2. Upgrade the database

  3. STOP the upgrade

  4. Run the PIM planner and obtain the migration plan


Run the PIM migrator

Do these steps to run the PIM migrator.

Warning

...

Before you run the PIM migrator on your production servers:

  1. you must run it in your lab environment

  2. you must run it in dry run mode with the migration plan from the PIM planner that you ran on a dump of your production database


Log in to ALL remote services servers and do these steps on EACH server. 

  1. Install the PIM tools

    Code Block
    yum install abiquo-pim-tools

    The default install folder is /opt/abiquo/pim-tools

  2. Obtain the datacenter-id of the Remote Services server from the value of the abiquo.datacenter.id property in the abiquo.properties file.

    Code Block
    abiquo.datacenter.id=abq_dc1

    In this case, the value of the datacenter-id parameter will be "abq_dc1"

  3. Run the PIM migrator in dry run mode, which is the default mode that doesn't make any changes.

    The "-noseed" parameter is required. The default value is false, which means the migrator will use the platform's default seed file. You can specify a seed file with the "-seed" parameter. 

    We recommend that you save the log in standard output to a file. And we recommend that you give the output files names that will identify the Remote Services server.

    For

...

  1. example 

    Code Block
    java -jar /opt/abiquo/pim-tools/pimmigrator.jar -dc=abq_dc1 -redishost=localhost -plan=migration-plan.data -noseed -output=update_DC1.sql 

...

  1. | tee pimmigrator_dry_run_DC1.log


  2. Check the output file. If there are any errors or warnings, resolve them.
    If necessary, contact Abiquo Support.

  3. Run the PIM migrator in update mode, by setting the "no dry run" option to true.

    Code Block
    java -jar /opt/abiquo/pim-tools/pimmigrator.jar -nodry -dc=abq_dc1 -redishost=localhost -plan=migration-plan.data -noseed -output=update_DC1.sql | tee pimmigrator_DC1.log


  4. Copy

...

  1. the SQL file from the

...

  1. remote services server to the Abiquo database server.

    For example

    Code Block
    scp update_DC1.sql root@my.database.server:~/


After you run the migrator on ALL Remote Services servers, run the SQL upgrades on the database server as described in the next step

Update the Abiquo database server

  1. Update the Abiquo database with all of the update.sql files. For example

    Code Block
    mysql kinton < update_DC1.sql
    mysql kinton < update_DC2.sql
    ...


Now continue with the Abiquo upgrade

PIM migrator options

Option

Alias

Required

Description

-dc

--datacenter-id

yes

ID of the current datacenter to migrate

-nodry

--no-dry-run

no

Set to 'true' in order to perform the changes (default: false)

-noseed

--no-seed

no

Don

yes

If true, don't use a seed file

, ignores

and ignore the seed property value (default: false)

-output

--output-file

no

SQL output file (by default 'update.sql')

-plan

--migration-plan-file

yes

Migration plan data file

-redishost

--redis-host

yes

Redis server host for this datacenter

-redisport

--redis-port

no

Redis server port for this datacenter (by default 6379)

-seed

--seed-file

no

Seed file (by default '/etc/abiquo/.store')


PIM migrator notes

The migrator does not process the following providers.

  • Hyper-V

  • Networker

  • Google Cloud Platform (see note below)

  • Firewalls and load balancers that are not in NSX

For Google Cloud Platform, if you have VMs deployed before the upgrade, after you apply the PIM tools, do these steps:

  1. Delete the VMs from the platform only 

    • in the API, delete them with the "logicaldelete" parameter set to true. See Delete a VM API doc 

  2. Delete the virtual datacenters

  3. Onboard the resources again